Microsoft’s FY25 financials tell a story that most enterprise customers have yet to fully absorb. The company has completed its transition from a software vendor to an infrastructure operator. Azure and other cloud services grew approximately 39% year-over-year in Q4 FY25, marking their strongest quarter since 2022. Azure’s annual revenue surpassed US $75 billion, up roughly 34% from the prior year. The broader Microsoft Cloud portfolio reached US $46.7 billion in Q4 FY25 alone, a 27% year-over-year increase. The Intelligent Cloud segment generated US$ 29.9 billion in that quarter, up 26% from the prior year. Microsoft now operates over 400 datacentres in approximately 70 regions worldwide, according to its 2025 Annual Report.

Wall Street analysts see performance highlights. Enterprise customers should see something else: the figures define Microsoft’s new cost structure and explain its new commercial behaviour. If you are negotiating a Microsoft Azure Consumption Commitment without understanding what these numbers mean for how Microsoft now operates, you are negotiating blind.

From Software Economics to Infrastructure Economics

Historically, Microsoft’s licensing business model carried almost zero marginal cost per unit sold. Once R&D and sales were covered, every additional licence was almost pure profit. Discounting had a limited financial impact because it reduced margin but not cost. A 25% discount on a Windows Server licence still left Microsoft with healthy margins because the incremental cost of producing that licence was effectively nothing.

Today, the economics are different.

Running Azure means managing global industrial-scale operations. Electricity and cooling for hyperscale data centres draw power comparable to that of small cities. Hardware refresh cycles require replacing tens of thousands of GPUs, CPUs, and networking components every three to five years. Facilities and real estate require building, maintaining, and securing datacentre campuses across dozens of countries. Networking demands backbone connectivity, redundancy, and latency management on a global scale. Operations and maintenance require 24/7 staffing, monitoring, disaster recovery, and compliance across every jurisdiction where Microsoft operates.

Microsoft spent roughly US$65 billion in FY25 on AI-optimised datacentres, capacity expansion, and related infrastructure. That figure represents the company’s largest single-year capital outlay ever. To put that number in context, it exceeds the annual GDP of over half the world’s countries. Microsoft is building physical infrastructure at a scale that rivals national governments.

Azure is a capital-intensive utilities business that happens to be operated by a software company. That reality is now reflected directly in how Microsoft discounts, and more importantly, in who qualifies for discounts at all.

Azure operates on infrastructure economics, not software economics. Capital expenditure, power, hardware refresh cycles, and global operations now directly shape Microsoft’s pricing and discount authority.

Account teams that once had substantial authority to offer discounts now face rigid approval processes for anything beyond standard rate cards. Deals that would have been approved routinely five years ago now require senior leadership sign-off. The flexibility that enterprise customers once took for granted has been systematically constrained.

The Competitive Landscape and Your Leverage

Microsoft’s investment scale has reshaped the enterprise cloud market. In 2025, Azure captured roughly 22% of global cloud infrastructure share, closing the gap with AWS at approximately 29% and pulling further ahead of Google Cloud at around 11%.

Understanding why enterprises are consolidating on Azure is essential for anyone preparing to negotiate a MACC, because these same factors explain why Microsoft believes it has leverage over you and where that belief might be misplaced.

Enterprises choose Azure for structural reasons. Windows Server, SQL Server, Active Directory, and .NET seamlessly transition to Azure. Azure Arc and Azure Stack support gradual, compliant cloud adoption. Enterprise Agreements and governance frameworks built for large corporates are already in place. Microsoft’s AI datacentre build-out and Copilot integration position Azure as an AI-ready enterprise platform. Microsoft can co-invest through internal budgets and partner incentives in ways that smaller competitors cannot match.

But default does not mean inevitable. Azure is often the path of least resistance, but you have alternatives. Microsoft’s account teams know whether you have a credible multi-cloud position or a viable repatriation strategy. If you do not, your negotiation leverage diminishes before you even sit down at the table.

I have seen this play out repeatedly. Organisations that arrive at MACC negotiations having done no analysis of AWS or Google Cloud alternatives are treated differently than those who can credibly discuss alternative architectures. You do not need to actually prefer the alternatives. You do not need to plan a migration away from Azure. You need Microsoft to believe that the alternative is real and that you would pursue it if the Azure terms are not competitive. Microsoft’s account teams are experienced negotiators. They sense bluffs. Genuine multi-cloud evaluation pays dividends: specific workloads that could run on AWS, pricing from Google Cloud, and understanding what repatriation to on-premises would involve.

The Current Negotiating Environment

Having alternatives helps. But the baseline has moved against buyers over the past two years.

Customers who secured aggressive discounts three or five years ago are discovering that those terms no longer exist. Renewals without year-over-year growth now attract discounts 25% to 50% lower than previous cycles. Finance teams that budgeted based on historical rates are finding renewal proposals significantly more expensive than expected.

The AI infrastructure build-out has intensified the pressure. Microsoft is deploying unprecedented capital into datacentre capacity, and that capital needs to generate returns. Account teams face internal targets for consumption growth, which shows up in negotiations as more aggressive tactics and less flexibility on terms.


🖐 Build your alternative position with expert support. Learn more: Pricing Research and Deal Benchmarking.


Why Microsoft Changed How It Discounts

So why has Microsoft tightened discounts so dramatically? Inside the company, it comes down to one principle: growth qualification.

Account teams are rewarded for year-over-year increases in consumption, not renewal volume. Each enterprise customer is ranked by consumption growth velocity:

Annual Growth Rate

Commercial Treatment

25–40% or higher

Qualifies for discounts and funding incentives

Flat or single-digit growth

No discount, treated as a low-priority maintenance account

Your discount entitlement is conditional. It is not based on your historical spend or your relationship with your account team. It is based on the growth narrative, which you can substantiate with data and credible workload plans.

Your negotiation leverage begins and often ends with how convincingly you can model and defend sustainable Azure growth. If you cannot demonstrate growth, you will not receive meaningful discounts. If you can demonstrate growth but cannot defend the forecast, you risk overcommitting to a MACC that becomes a financial liability.

I wrote about this in detail when Microsoft released its Q3 FY25 results. The best discounts are now reserved for mega-deals: $45 million or more in commitments over three years.

What a MACC Actually Is

A Microsoft Azure Consumption Commitment is a contractual obligation to consume a defined monetary amount of Azure services over a fixed term, typically three years. It is a commitment, not a forecast, and it carries binding financial consequences.

But many organisations treat MACC discussions as planning exercises, projecting what they expect to spend on Azure and assuming flexibility if circumstances change. That is not how the contract works.

Key facts about MACC structure:

🔹 The commitment is non-cancellable and non-refundable. Once you sign, you are obligated to spend the committed amount regardless of whether your consumption materialises as planned.

🔹 The MACC is an amendment to your EA or MCA-E, not a standalone agreement.

🔹 Azure Marketplace purchases only count toward MACC fulfilment if they are designated as Azure benefit eligible. Not all Marketplace spend qualifies, and the distinction is not always obvious in the purchasing interface.

🔹 Under-consumption means liability for the full committed value. If you commit to $10 million over three years and consume $7 million, you still owe the remaining $3 million. In many cases, that shortfall is converted into Azure Prepayment that you can use for future consumption, provided your enrolment remains active or is renewed. If your agreement expires without renewal, you pay the shortfall without receiving the prepayment credit.

🔹 There is no automatic rollover or rebalancing. If your first year runs under budget and your second year runs over, you do not automatically balance out. Any flexibility in this area must be negotiated explicitly.

For a detailed breakdown of MACC mechanics, including how eligible services are defined and how shortfall invoices work, see our comprehensive guide to the Microsoft Azure Consumption Commitment.

The Primary Risks of MACC Agreements

Five things turn MACC agreements from commercial advantages into financial liabilities.


1️⃣ Overcommitment due to inflated forecasts or sales pressure. Microsoft account teams are incentivised to maximise your commitment. They will present optimistic scenarios and push for higher numbers. Meanwhile, internal stakeholders may overestimate their cloud adoption timelines or underestimate the complexity of migration projects. The result is a commitment that exceeds realistic consumption, leaving you liable for the gap.

I have watched this play out at dozens of organisations. The typical progression looks like this: a company enters MACC negotiations with a reasonable estimate of $8 million over three years. Microsoft’s account team pushes for $12 million, arguing that the company’s digital transformation plans justify the higher number and that the discount structure requires the larger commitment. Internal IT leadership, eager to secure budget and cloud capacity, supports the higher figure. Finance, unfamiliar with cloud consumption patterns, defers to IT. The deal closes at $12 million.

Eighteen months later, the company has consumed $4 million against a pro-rata target of $6 million. Migration projects have slipped. Cost optimisation has been more successful than anticipated. The consumption trajectory suggests a total of $8 million to $9 million over three years, precisely what the original estimate indicated. But the commitment is $12 million, which means a shortfall of $3 million to $4 million looms.

At this point, the organisation faces unpalatable choices. It can consume wastefully, spinning up resources it does not need simply to burn through commitment. It can accelerate projects that are not ready, introducing operational risk. Or it can accept the shortfall, paying Microsoft for capacity it did not use.

None of these outcomes represents good cloud economics. All of them trace back to an overcommitment that should never have been made.


2️⃣ Volatile usage from project delays or optimisation savings. Azure consumption is rarely linear. Major workloads get delayed. Cost optimisation initiatives reduce spending. Business conditions change. A MACC that made sense when you signed may become a burden eighteen months later when your consumption trajectory has shifted.

The sources of volatility are numerous and often unpredictable. A major application modernisation project slips by six months due to technical complexity. A cost-optimization programme delivers savings faster than expected, reducing your consumption run rate. A business unit that was planning significant Azure expansion changes strategy due to market conditions. A merger or acquisition changes your organisational footprint. A pandemic forces wholesale changes to how your organisation operates.

None of these scenarios is unusual. Collectively, they are more likely than not. The question is whether your MACC structure accommodates them.

Organisations that sign rigid MACCs based on optimistic, linear consumption forecasts are betting that none of these scenarios will materialise. They are betting that every planned project will deliver on schedule, that no cost optimisation will succeed, that no business conditions will change. Such bets are rarely won.

The alternative is to build contingency into your commitment structure. Commit to lower numbers with provisions for upward adjustment if consumption exceeds expectations. Negotiate rollover provisions that accommodate timing variations. Establish true-down rights that allow commitment reduction if circumstances warrant.

Some volatility protection will cost you in the form of modestly lower discounts. That cost is typically a sound investment. Accepting slightly lower discounts in exchange for flexibility provisions is cheaper than paying a shortfall invoice on an unrealistic rigid commitment.


3️⃣ Programme rigidity limiting flexibility across workloads and regions. Without explicit flexibility clauses, you may find yourself locked into spending patterns that no longer match your operational needs. The ability to shift spend between services or geographies can be critical, but it is not automatic.


4️⃣ Inconsistent eligibility excluding spend categories from MACC credit. Not all Azure spending counts toward your commitment. Understanding exactly which services qualify is essential before you commit.


5️⃣ Discount erosion if current growth targets are missed. If you enter a MACC promising 30% growth and deliver 10%, your position in future negotiations weakens substantially. Microsoft’s internal systems track your growth performance, and account teams adjust their approach accordingly.


The MACC is designed to convert consumption volatility into predictable revenue for Microsoft. Your objective is to design terms that return predictability without sacrificing flexibility.

Structuring a Commitment That Protects Value

A defensible MACC structure balances Microsoft’s need for forecastable growth with your need for control. Discount percentage gets the attention. The architecture of the commitment deserves it more.

Establish a Realistic Baseline

Before you discuss numbers with Microsoft, you need an accurate picture of your current consumption and a credible projection of future demand.

Use twelve to eighteen months of actual consumption as your baseline. Shorter periods may not capture seasonal variations or project-driven spikes. Longer periods may include older data that no longer reflects your current trajectory.

Use twelve to eighteen months of actual consumption as your baseline. Build your commitment from the credible midpoint scenario, not from the optimistic case.

Exclude temporary or one-off workloads from your baseline. If you ran a major data migration project last year that consumed significant Azure resources, that consumption should not inflate your baseline unless you expect similar projects to continue.

Create three scenarios: low, medium, and high. Build your commitment from the credible midpoint, not from the optimistic case. Microsoft will push you toward the high scenario. Your job is to ensure the commitment remains achievable even if some projects slip or some optimisation initiatives succeed.

Tier the Growth Commitments

Rather than committing to a single flat growth rate, structure your commitment in tiers that provide flexibility while still demonstrating ambition.

Tier

Growth over Baseline

Commercial Treatment

Tier 1

10–15%

Minimal recognition, baseline pricing

Tier 2

25%

Full access to discounts and incentives

Tier 3

40%+

Maximum funding and strategic status

Tiering allows you to commit ambition while retaining downside protection. If your growth comes in at 15% rather than 25%, you receive less favourable treatment but you are not penalised for falling short of an unrealistic target.

The specific percentages and benefits will vary depending on your organisation’s size, industry, and relationship with Microsoft. But the principle of tiered commitment is broadly applicable and worth pursuing in any significant MACC negotiation.

Negotiate Structural Flexibility

Beyond the headline commitment and discount, several structural provisions can significantly affect the value you extract from a MACC.


Rollover provisions allow unused spend from one period to apply to future periods. Without rollover, any under-consumption in a given year is lost value. With rollover, you retain flexibility to adjust your consumption timing without losing credit.

When Microsoft’s initial position is that rollover is not available, push back. Frame rollover as governance best practice: organisations that cannot roll over unused commitment face incentives to consume wastefully rather than optimise.

True-up and true-down clauses enable annual recalibration within agreed bounds. If your consumption consistently runs above or below the committed rate, these clauses allow adjustment rather than forcing you to carry an increasingly unrealistic commitment.

Rebalancing rights let you move spend between services or geographies. As your cloud strategy evolves, the services and regions you prioritised at signing may not reflect your current needs. Rebalancing rights prevent you from being locked into an outdated allocation.

Price protection ties discounts to a fixed rate card rather than floating list prices. Azure pricing changes frequently. Without price protection, your effective discount can erode as Microsoft adjusts its base pricing.

Extension clauses provide optional additional years if conditions change. If your original three-year term ends with significant unused commitment, an extension clause may allow you to spread the remaining obligation over additional time rather than facing a shortfall invoice.


Not all of these provisions will be available in every negotiation, and some will require trade-offs against other terms. But understanding what structural flexibility is possible helps you prioritise.

Align Incentives Beyond Discounts

Discounts are not the only commercial benefit available in MACC negotiations. Microsoft offers various funding and incentive programmes that can add substantial value if you know to ask for them.

  • Tie your commitment to specific funding programmes such as migration support, Azure credits, or engineering hours. These programmes exist but are not automatically offered. You must request them and connect them to your commitment structure.

  • Ensure Marketplace purchases count toward MACC fulfilment. As mentioned earlier, not all Marketplace spend qualifies by default. Confirming eligibility and ensuring your procurement processes capture qualified spend can meaningfully affect your consumption rate.

  • Request joint consumption reviews with Microsoft. Regular check-ins provide transparency into your consumption trajectory without giving up control over your strategy. They also create opportunities to surface issues early and negotiate adjustments before problems compound.


🖐 Maximise incentives and funding in your Azure negotiations. Learn more: Microsoft Azure Contract Negotiation.


Sequence the Growth

Avoid front-loading your commitment.

Starting with aggressive Year 1 targets and ramping down is tempting because it demonstrates immediate value to Microsoft and may unlock early incentives. But it also creates risk. If your migration timelines slip or your adoption runs slower than expected, you begin the relationship by missing targets, which damages your credibility and weakens your position for subsequent discussions.

Start conservative in Year 1, ramp in Years 2 and 3 as migration proof materialises. This approach aligns your commitment with the typical rhythm of cloud adoption, where early phases involve experimentation and setup while later phases see accelerating production workloads.

It also preserves flexibility. If Year 1 exceeds expectations, you are in a strong position to discuss enhanced terms. If Year 1 runs light, you have built-in headroom to catch up rather than already being behind.

The Negotiation Framework

Structuring a good MACC is only half the challenge. You also need to negotiate effectively with Microsoft’s account teams, who are skilled professionals with clear incentives and well-established tactics.

Preparation

Before any negotiation meeting, complete three preparation steps.

  1. Benchmark discount ranges based on peer deals. Microsoft account teams have access to extensive data about what other customers in your industry and size segment are paying. You should have similar visibility. Without benchmarks, you cannot assess whether an offer is competitive or whether you have room to push.

  2. Quantify exposure for under-consumption. Model what happens if your consumption comes in at 70%, 80%, or 90% of commitment. Calculate the shortfall amounts. Understand the prepayment conversion terms. Know your worst-case exposure before you commit.

  3. Align finance, procurement, and IT on one internal position. Microsoft account teams are adept at identifying internal disagreements and exploiting them. If your IT leadership wants maximum cloud capacity while your CFO wants minimal commitment, Microsoft will find that gap and use it. Present a unified position.

Internal alignment is harder than it sounds. Finance measures success in cost control and budget predictability. IT measures success in capability delivery and technical flexibility. Procurement measures success in vendor management and contract terms. These metrics can pull in different directions during MACC negotiations.

Finance may prefer a smaller commitment to reduce financial exposure. IT may push for a larger commitment to avoid capacity constraints on planned projects. Procurement may accept additional complexity in exchange for better pricing, even when simpler structures would be easier to manage. These tensions are natural and legitimate.

The work of alignment should happen before negotiations begin, not during them. Convene the relevant stakeholders. Discuss the trade-offs. Establish priorities. Agree on boundaries. Document the agreed position. Then present that position consistently throughout negotiation.

Microsoft account teams test internal alignment in subtle ways. They may ask procurement about IT’s capacity plans. They may ask IT about finance’s budget constraints. They may suggest to one stakeholder that another stakeholder has indicated flexibility. These probes are designed to surface disagreements that Microsoft can exploit.

During MACC negotiations, misalignment between finance, IT, and procurement creates exploitable gaps. Microsoft account teams actively probe these differences and adjust their negotiation strategy accordingly.

The defence is a single point of contact for substantive negotiation discussions, with clear internal communication protocols. All stakeholders should have visibility into negotiation conversations, but not all stakeholders should be participating directly. Mixed messages invite exploitation.

I have seen negotiations fail because internal stakeholders were negotiating independently with different Microsoft contacts, each making commitments or statements that conflicted with the others. Microsoft aggregated these conversations and used the inconsistencies to their advantage. Internal coordination prevents this outcome.


🖐 Get market-rate benchmarks before you negotiate. Learn more: Pricing Research and Deal Benchmarking.


Positioning

Lead with structure, not discount. The natural tendency is to focus negotiation conversations on the discount percentage. Resist this temptation. Discounts are meaningless if the underlying structure exposes you to unmanageable risk.

Open with something like: “We’ll discuss price once we agree on flexibility and risk allocation.” This framing shifts the conversation from a discount haggle to a commercial architecture discussion. It also signals that you understand how MACC negotiations actually work, which changes how Microsoft’s team approaches you.

Frame the negotiation as risk management, not discount chasing. Discounts are a reward for taking risk. The question is whether the risk you are taking is appropriately compensated and appropriately managed. If you accept a large commitment with minimal flexibility, you should receive a correspondingly large discount. If Microsoft wants you to take growth risk, Microsoft should share in the downside if growth does not materialise.

Discounts compensate for risk. If growth risk sits entirely with the customer, the commercial structure is misaligned.

Use Microsoft’s own metrics to your advantage. If Microsoft’s internal qualification model requires 25–40% growth for discount eligibility, reference that model explicitly: “If we align our growth assumptions with your internal targets, we expect reciprocal flexibility on commitment structure.

Leverage Points

Four leverage points appear consistently in successful MACC negotiations.

1️⃣ Fiscal timing. Microsoft’s fiscal year ends in June. The weeks leading up to that deadline create pressure on account teams to close deals and hit targets. Aligning your negotiation timeline with Microsoft’s fiscal calendar can create urgency that works in your favour. The same dynamic appears at quarter-end, though less intensely.

The fiscal timing leverage is most powerful in May and early June. Account teams are scrambling to close deals before year-end. Approval processes that typically take weeks can compress to days. Discount authority that was unavailable in February may suddenly become available in June.

To use this leverage effectively, you need to have completed your preparation earlier in the year. An organisation that begins MACC negotiations in May, hoping to benefit from fiscal pressure, will not have time to establish baselines, develop scenarios, or create negotiating leverage. The fiscal timing benefit accrues to organisations that are ready to close, not to those just starting the process.

Microsoft’s fiscal year ends June 30, but revenue must be booked by approximately June 20 to count toward account team targets and compensation. May is therefore the pressure window. Work backward from there: if you want to close in May, you need to be negotiating in March and April, which means preparation in January and February.

2️⃣ Alternatives. Maintain a credible multi-cloud position. You do not need to actually migrate significant workloads to AWS or Google Cloud, but you do need Microsoft to believe that you could. Credible alternatives prevent Microsoft from assuming you are captive, which changes the negotiation dynamic substantially.

3️⃣ Marketplace ecosystem. Using Azure Marketplace to purchase third-party services that count toward your MACC can accelerate consumption and improve your utilisation rate. It can also provide negotiating leverage, since Microsoft benefits from ecosystem transactions beyond your direct Azure spend.

4️⃣ Executive escalation. Senior Microsoft leadership has discretionary funding and approval authority that account teams do not. If your negotiation stalls at the account team level, escalation to more senior Microsoft stakeholders can unlock concessions that were previously unavailable. This tactic should be used sparingly, but it is a legitimate tool when standard channels are insufficient.

The key to effective escalation is timing and framing. Escalate too early, and you damage your relationship with the account team without meaningful benefit. Escalate too late, and you run out of time to leverage the additional authority. Escalate without clear asks, and the senior stakeholder has nothing concrete to action.

Effective escalation typically works like this. Conduct multiple rounds of negotiation with your account team. Identify specific issues where their authority appears limited. Request escalation to someone with authority to address those specific issues. Frame your request constructively: “We have had productive discussions with the account team, but we seem to have reached their authority limit on rollover provisions. We would like to discuss this with someone who has authority to address it.

There are two paths to escalation. The first, and more common, is to ask your account team to escalate on your behalf. Frame the request constructively and give them a clear issue to take upward. The second is direct escalation, where your executives contact Microsoft leadership directly. Direct escalation requires existing relationships or connections and is not available to most organisations. If you do have access to senior Microsoft contacts, use it selectively for significant issues rather than routine negotiation points.

Handling Microsoft’s Tactics

Microsoft account teams are well-trained negotiators with established playbooks. Recognising common tactics helps you respond effectively.

Microsoft’s negotiation tactics consistently push customers toward higher commitments and lower structural flexibility unless countered with data, governance, and disciplined evaluation of risk.

Inflated baselines. Account teams may present consumption projections that exceed your actual trajectory, hoping you will commit to their numbers rather than your own analysis. Counter this by grounding every discussion in your own data. Bring twelve to eighteen months of actual consumption and your own forward projections. Do not accept Microsoft’s projections as the starting point.

Rollover denial. When you request rollover provisions, the initial response may be that rollover is not available or not standard. Rollover is not automatic, but it can be negotiated. Frame your request as governance best practice: organisations that cannot roll over unused commitment face incentives to waste resources rather than optimise, which is contrary to sound cloud economics.

Verbal incentive commitments. Account teams may promise incentives, funding, or flexibility verbally without committing them in writing. Verbal promises are worthless. Demand written confirmation for all incentive commitments before you sign. If it is not in the contract, it does not exist.

Headline discounts unlinked to structure. A 20% discount sounds impressive, but headline discounts unlinked to structure rarely hold through term. If tied to an inflexible commitment that you are unlikely to meet, the effective value is far lower. Evaluate discounts in the context of the full structure, not in isolation. A 15% discount with strong flexibility provisions may be more valuable than a 20% discount with rigid terms.

I see this tactic frequently. Microsoft offers a headline discount that captures internal attention. Procurement reports to leadership that they secured 20% off. Leadership is pleased. The deal closes. Twelve months later, the organisation discovers that the commitment was unrealistic, the flexibility provisions were absent, and the effective value of the agreement is far less than the headline discount suggested.

The antidote is to evaluate total cost of ownership across realistic scenarios. Model what happens if consumption is 70%, 80%, 90%, and 110% of commitment. Calculate the shortfall exposure in each scenario. Factor in the value of flexibility provisions. Then compare the 20% discount with rigid terms against the 15% discount with flexible terms. The answer is often not what the headline numbers suggest.

Internal alignment risks. Microsoft account teams often develop close relationships with IT leaders within customer organisations. These relationships can be positive, but they can also create information asymmetry. Technical stakeholders may share deployment plans, usage data, or competitive evaluations that strengthen Microsoft’s negotiating position. Ensure that negotiation decisions involve stakeholders from finance and procurement alongside those with direct Microsoft relationships.

Governance After Signature

Execution discipline determines outcome. A well-negotiated MACC can still become a liability if consumption is not actively managed against commitment.

Too many organisations treat MACC signature as the end of the process rather than the beginning. They negotiate carefully, sign the deal, and then fail to monitor consumption until a shortfall becomes unavoidable.

Monthly Tracking

Track consumption against commitment monthly, not quarterly. Quarterly tracking provides insufficient lead time to adjust course if consumption is running light. Monthly tracking surfaces issues early enough to take corrective action.

Quarterly MACC tracking identifies shortfalls when corrective action is limited. Monthly tracking creates sufficient lead time to adjust consumption before under-commitment becomes unavoidable.

The tracking should compare actual invoiced amounts against the monthly run rate required to meet your annual and total commitment. If you are committed to $12 million over three years, you need to average $333,000 per month. If you are averaging $280,000 in months one through six, you have a consumption gap that requires attention.

The mechanics of monthly tracking are straightforward. Your Azure invoice provides the consumption data. Your MACC agreement provides the commitment schedule. Comparing the two requires basic arithmetic, not sophisticated analytics.

What makes monthly tracking valuable is not the complexity of the analysis but the discipline of performing it. Organisations that track monthly catch problems early. Organisations that track quarterly or annually discover problems when it is too late to address them efficiently.

The tracking should also distinguish between eligible and ineligible consumption. Not all Azure spending counts toward your MACC. Support plans, certain subscription types, and non-designated Marketplace purchases are typically excluded. Your tracking should reflect what actually counts toward your commitment, not simply your total Azure bill.

I recommend creating a simple dashboard that shows three metrics: cumulative consumption to date, pro-rata commitment to date, and the gap between them. Update this dashboard monthly. Share it with the stakeholders who own major Azure workloads. Make the consumption trajectory visible so that variance becomes everyone’s problem.

Quarterly Variance Reviews

Beyond monthly tracking, conduct quarterly variance reviews that examine the underlying causes. Are specific workloads consuming less than expected? Have migration timelines slipped? Are cost optimisation initiatives reducing spend faster than anticipated?

Understanding the causes of variance enables targeted responses. If a major workload migration has been delayed by six months, you can adjust your forecast and potentially discuss commitment modifications with Microsoft. If cost optimisation has been more successful than expected, you may need to accelerate other consumption to maintain your trajectory.

Alert Thresholds

Establish alert thresholds at 70%, 90%, and 100% of commitment. The 70% threshold is your early warning. If you reach 70% of elapsed time with less than 70% of consumed commitment, you have a potential problem that needs attention. The 90% threshold is your action trigger. By this point, any shortfall requires immediate mitigation. The 100% threshold is your accounting event. What happens at commitment expiry should be fully anticipated, not a surprise.

Mitigation Actions

When consumption runs below commitment, several mitigation actions are available.

Accelerate eligible workloads. If workloads are scheduled for cloud migration in the next fiscal year, consider accelerating them to consume commitment in the current year. The operational disruption may be worthwhile if it prevents a shortfall invoice.

Increase Marketplace spend. Third-party services purchased through Azure Marketplace can contribute to MACC fulfilment if they are designated as Azure benefit eligible. Identify Marketplace opportunities that you would pursue anyway and pull them forward to boost consumption.

Review Azure Reservations and Savings Plans. Purchasing reservations or savings plans consumes MACC commitment upfront while providing ongoing cost savings. If you are running under commitment, a strategic reservation purchase can address the gap while simultaneously improving your long-term cost position.

Azure reservations and savings plans can convert MACC under-consumption into discounted future usage by consuming commitment upfront while reducing long-term pay-as-you-go spend.

The arithmetic here can be counterintuitive but is worth understanding. Suppose you are $500,000 under your MACC run rate for the year. You could let that shortfall persist and eventually pay a shortfall invoice. Alternatively, you could purchase Azure reservations with a three-year term, consuming that $500,000 of MACC commitment immediately while securing discounted rates for the reservation term.

The reservation approach has two benefits. First, it eliminates the shortfall and keeps your MACC on track. Second, reservations typically offer 30% to 60% discounts compared to pay-as-you-go rates, so your $500,000 investment generates more value than it would have as unused commitment.

The catch is that reservations require confidence in your future consumption. A reservation for virtual machine capacity that you do not use wastes money, even if it technically meets your MACC commitment. Use reservations as a mitigation tool only when you have high confidence in the underlying workload.

Savings plans offer similar benefits with more flexibility. Unlike reservations, which lock you into specific instance types in specific regions, savings plans apply to compute consumption more broadly. The discount rates are typically lower than reservations, but the flexibility risk is also lower.

➡️ For a detailed comparison of reservations and savings plans and guidance on when each makes sense, see our guide to Azure Savings Plans vs Reserved Instances.

➡️ For detailed tactics on Azure cost optimisation that can be balanced against MACC consumption targets, see our guide to cost optimisation in 30 days or less.

Renewal Readiness

Begin renewal analysis nine to twelve months before your MACC expires. Use actual consumption data from the current term to re-baseline your commitment for the next cycle.

If your current term demonstrated 20% annual growth, use that as your starting point for the next commitment, not the 35% growth that Microsoft’s account team suggests. Ground every projection in demonstrated performance.

Renewal is also an opportunity to renegotiate terms that did not work as expected. If your current MACC lacks rollover provisions and you experienced consumption volatility, make rollover a priority for the next cycle. If price protection was insufficient, address that gap.


🖐 Implement ongoing Azure cost management with expert support. Learn more: Microsoft Azure Cloud Cost Optimisation.


The Distinction Between FinOps and Cost Optimisation

A brief but important digression. Many organisations assume a FinOps practice covers cost optimisation. It doesn’t.

FinOps is a practice of financial visibility and accountability for cloud spending. It provides data about what you are spending, where, and why. It allocates costs to business units and projects. It creates transparency and governance.

FinOps does not, by itself, reduce costs.

FinOps creates visibility into cloud spending. Cost optimisation requires authority to change consumption. Visibility without execution reduces transparency risk, not cost.

Cost optimisation is the practice of actually eliminating waste and improving efficiency. It involves rightsizing instances, decommissioning unused resources, optimising storage tiers, implementing savings plans, and dozens of other tactical interventions that reduce your Azure bill.

FinOps as a framework includes optimisation, but many organisations implement only the visibility and reporting aspects. The team can see the waste but cannot do anything about it. They need authority and incentives, not dashboards.

Many organisations have robust FinOps practices but weak cost optimisation incentives. Their FinOps teams have excellent visibility into spending but no mandate or mechanism to actually reduce it. In some cases, business units are incentivised to spend their allocated budgets rather than return savings to the organisation. That mindset persists in cloud environments where it makes no sense.

The problem compounds when FinOps and cost optimisation are conflated. A CIO reports to the board that the organisation has implemented FinOps. The board assumes costs are being managed. Nobody notices that the FinOps team has visibility without authority, that they can see waste but cannot eliminate it, that their dashboards display inefficiency without driving action.

One of my colleagues describes a common situation: a Chief Information Officer requires approval for purchase orders exceeding $50,000, but an Azure architect can engage services and commit to half a million dollars per year without needing approvals or accountability. The governance frameworks that apply to traditional IT procurement often do not extend to cloud consumption. FinOps provides visibility into this gap. Cost optimisation closes it.

The connection to MACC management is direct. If your FinOps practice provides visibility but not optimisation, your consumption trajectory will be higher than necessary. That may help you meet your MACC commitment, but it does so by spending more money rather than by getting more value. And it positions you poorly for renewal, when a consumption baseline inflated by waste becomes the foundation for your next commitment.

I have seen organisations enter MACC renewals with consumption baselines inflated by significant waste. They have been spending inefficiently for years. That inefficient spending has become their baseline. Microsoft’s account team proposes a new commitment based on that inflated baseline, and the organisation commits to another three years of paying for waste.

A sound approach balances MACC consumption targets against genuine cost optimisation. You should be meeting your commitment through valuable workloads, not through waste. This balance requires both FinOps visibility and genuine optimisation authority. It requires someone who can not only see that a development environment has been running unused for six months but can actually shut it down.

➡️ For a comprehensive exploration of FinOps principles and implementation, see our CFO’s Guide to FinOps.

Governance Converts Liability into Investment

Governance is the only guarantee of long-term value. Without it, even a well-negotiated MACC becomes a liability.

The difference is control. A governed MACC is one where you know your consumption trajectory, understand the variance causes, have action plans for mitigation, and are positioned for renewal discussions well before the term expires. An ungoverned MACC is one where you hope consumption works out and discover too late when it does not.

A governed MACC provides visibility into consumption trajectory, variance drivers, and mitigation options early enough to act. An ungoverned MACC reveals problems only when corrective action is no longer possible.

The investment in governance is modest compared to the exposure. Monthly tracking requires a few hours of analysis. Quarterly variance reviews require a half-day commitment from relevant stakeholders. Renewal preparation requires sustained attention for two or three months before the deadline. None of this is onerous for agreements worth tens of millions of dollars.

Yet many organisations fail to make these investments, treating their MACC as a signed document rather than an active programme. The result is shortfall invoices, erosion of negotiating position, and commercial outcomes that fall well short of what good governance would have achieved.

Microsoft’s Position and Yours

Microsoft’s Azure strategy is driven by growth metrics, infrastructure economics, and shareholder expectations. The company has invested tens of billions of dollars in datacentre capacity and needs customers who will consume that capacity at rates that justify the investment.

Understanding Microsoft’s position is not the same as accepting it as your constraint.

Microsoft’s account teams operate under internal metrics that prioritise growth over renewal. An account team that renews a $10 million MACC at $10 million receives limited recognition. An account team that grows a $10 million MACC to $15 million receives substantially more recognition, even if the customer is unlikely to consume $15 million. This incentive structure shapes every conversation you have with your Microsoft representatives.

Microsoft’s account teams are rewarded for MACC growth, not for successful renewals. This incentive structure shapes pricing authority, escalation paths, and negotiation behaviour.

Microsoft’s pricing authority is tiered. Account teams have limited discount authority. Regional leadership has more. Senior executives have the most. Understanding these tiers helps you calibrate when escalation might unlock additional concessions. An account team saying “this is the best we can do” may genuinely be at their authority limit, but that does not mean additional authority is unavailable through escalation.

Microsoft tracks customer data extensively. Your account team knows your historical consumption, your growth trajectory, your licence compliance, and your competitive position. They have access to benchmarking data showing what peer organisations in your industry and size segment are paying. They may know more about your Azure usage than you do. Approaching negotiations without similar data disadvantages you substantially.

Your position as a buyer is different. You need Azure capacity that matches your workload requirements at prices that deliver value. You need flexibility to adjust as your business evolves. You need protection against commitment structures that assume more certainty than your planning can deliver.

The asymmetry in positions is important. Microsoft wants growth. You want value. These interests can align, but they do not align automatically. A MACC that delivers growth for Microsoft may or may not deliver value for you, depending on whether the commitment matches your realistic consumption trajectory.

The role of a smart negotiator is to operate inside Microsoft’s framework while advancing your own interests: understand the growth qualification model, demonstrate the growth narrative that unlocks discounts, ensure the commitment structure protects you if growth does not materialise, and use Microsoft’s fiscal calendar and competitive alternatives to create leverage while maintaining a constructive relationship with your account team.

Effective MACC negotiation is not adversarial. Microsoft and its customers both benefit from agreements that work well. Microsoft gets predictable consumption. Customers get competitive pricing and the cloud capacity they need. The negotiation is about finding the structure that creates value for both sides while protecting each party’s core interests.

But effective negotiation does require clarity about what your interests are, willingness to advocate for them, and the preparation to back up your positions with data and analysis. Too many organisations approach MACC negotiations passively, accepting Microsoft’s framing, Microsoft’s baselines, and Microsoft’s timeline. Passivity rewards Microsoft at the customer’s expense.

The organisations that negotiate most effectively are those that enter conversations with clear objectives, credible alternatives, and the patience to pursue multiple negotiation cycles. They understand that the first offer is not the final offer. They understand that account teams have authority limits but that escalation can unlock additional flexibility. They understand that Microsoft needs their business more than Microsoft typically admits.

I have negotiated hundreds of Microsoft agreements over twenty-five years, first on Microsoft’s side of the table and now on the customer’s side. The leverage available to well-prepared customers is greater than most organisations realise. The gap between what Microsoft initially offers and what Microsoft will ultimately accept is often substantial, plus flexibility provisions that are not offered initially but are available when requested.

The customers who capture that value are those who prepare thoroughly, negotiate patiently, and maintain discipline throughout the process. The customers who leave value on the table are those who accept early offers, fail to develop alternatives, or let internal pressure force premature commitments.

The Long Game

I want to close with a broader perspective before summarising the tactical guidance.

Cloud adoption is a multi-decade journey, not a one-time decision. Most large organisations are still in the early stages. The MACC you negotiate this year will shape your options for the next three years, and the precedents you set now will influence your negotiations for the next decade.

Organisations that approach MACC negotiations transactionally, focusing only on the immediate deal, miss this longer perspective. The terms you accept today become precedents for future negotiations. The consumption baselines you establish become the foundation for future commitments. The relationship dynamics you create with your account team persist across multiple negotiation cycles.

MACC terms, consumption baselines, and negotiation dynamics established today become reference points for future renewal cycles and shape leverage over multiple years.

Taking the long view changes how you approach several aspects of negotiation.

On commitment levels, it suggests erring toward conservatism. An organisation that consistently meets or exceeds its MACC commitments builds a track record of reliability that Microsoft values. An organisation that consistently falls short builds a track record of overcommitment that weakens its credibility. Better to commit to $10 million and deliver $12 million than to commit to $15 million and deliver $12 million, even though the consumption is identical.

On flexibility provisions, it suggests prioritising structure over discount. The discount you secure today affects the next three years. The structural provisions you establish, rollover rights, rebalancing authority, price protection, create frameworks that can persist across multiple agreement cycles. Organisations that secure strong structural provisions early often find those provisions carried forward into subsequent agreements. Organisations that accept rigid structures often find themselves negotiating from a weaker position when renewal comes.

On alternatives, it suggests continuous investment. The credibility of your alternatives depends on ongoing work, not last-minute preparation. Organisations that maintain active multi-cloud capabilities, even at modest scale, preserve leverage across multiple negotiation cycles. Organisations that let alternatives atrophy find themselves increasingly captive with each passing year.

Microsoft is playing a long game. The company’s investment in datacentre infrastructure, its AI strategy, its commercial programme evolution, all reflect planning horizons measured in decades. Customers should match that perspective. The negotiation you are conducting now is one move in a much longer game. Play it accordingly.


🖐 Build long-term Microsoft licensing strategy with expert support. Learn more: Microsoft Enterprise Agreement Negotiation.


Six Principles for MACC Negotiation

Let me close with the core principles that should guide any significant MACC negotiation.


🔹 First: Microsoft’s economics have changed fundamentally. The company now operates capital-intensive infrastructure, not zero-marginal-cost software. Discounting behaviours reflect this reality, and your negotiation strategy should as well.

🔹 Second: Discounts are now a reward for growth, not a right of renewal. Only accounts demonstrating 25–40% annual MACC growth qualify for meaningful discounts and incentives. Flat or single-digit growth receives no discount.

🔹 Third: Structure matters more than discount percentage. A modest discount with strong flexibility provisions may be more valuable than an aggressive discount with rigid terms. Lead negotiations with structure, not price.

🔹 Fourth: Baseline rigorously. Use twelve to eighteen months of actual consumption. Exclude one-off workloads. Build commitment from the credible midpoint scenario, not the optimistic case.

🔹 Fifth: Negotiate flexibility explicitly. Rollover, rebalancing, true-up, price protection, and extension rights are all available but not automatic. You must request them and connect them to your overall commercial framework.

🔹 Sixth: Governance determines outcome. Monthly tracking, quarterly variance reviews, alert thresholds, and renewal preparation are not optional extras. They are the difference between a managed investment and an unmanaged liability.


Microsoft’s Azure strategy is driven by growth metrics, infrastructure economics, and shareholder expectations. The role of a smart negotiator is to operate inside that framework and turn Microsoft’s own priorities into your leverage.


🖐 Get expert support for your MACC negotiation. Learn more: Microsoft Azure Contract Negotiation.


Table of contents
print
share

Read next

More articles